The Groups SHP Projects are:

  • ENERGY

 Himachal

Solang Hydro Proj (1.5 MW)
Beas Hydro Proj (2.25 MW)
Haripur Hydro Proj (2.5 MW)
  •  Uttarakhand

H. Ganga Hydro Proj (4.95 MW)
Badyar Hydro Proj (5.70 MW)
Gangani Hydro Proj (9.60 MW)
Nishni Hydro Proj (1.90 MW)

 Combined Power Generation of the Group is of 24.1  MW, and expanding

  • On Anvil

Taiti Hydro Proj (10.0 MW) Bid for
Shalvi Hydro Proj (7.0 MW) Bid for
and many projects have been bid for
 
All Copyrights Reserved : APH Regency Power Group